INVESTIGATION 01: The Chenab Has a Breaking Point · CHAPTER 03 OF 15
Chapter 03 — Hydroelectric infrastructure inventory
Himalayan Dispatch Research Desk | Jammu Division Scientific Investigations
Compiles a verified engineering cadastre of operational — Dulhasti (390 MW), Baglihar (890 MW), Salal (690 MW) — under-construction, and proposed (including Sawalkote) hydroelectric projects across the mainstem and tributaries.
Within Investigation 01 (The Chenab Has a Breaking Point), Chapter 03 operationalizes Himalayan Dispatch's foundational rule—scientific discovery before editorial conclusions—by defining explicit observational datasets, falsifiable metrics, and validation gates prior to publishing empirical findings.
PRINCIPAL SCIENTIFIC QUESTIONS & HYPOTHESIS LINKAGE
- •What proportion of the Chenab mainstem between Kishtwar and Akhnoor is impounded or bypassed by tunnels once all proposed schemes are included?
- •What are the authenticated dam heights, live/dead storage volumes, tunnel lengths, and muck-disposal sites?
- •Primary Hypothesis Linkage: Evaluates how "Hydroelectric infrastructure inventory" tests Investigation 01's central hypothesis across the 1985–2026 baseline.
PRIMARY DATA INFRASTRUCTURE & ANALYTICAL METHODS
- •PARIVESH EIA/EC dossiers, CEA/NHPC/JKSPDC statutory technical schedules
- •Sentinel-2 10 m optical verification of dam, barrage, portal, and spoil-bank footprints
- •10-Stage Publication Standard Gate: Requires Stage 05 independent data validation and Stage 07 external specialist peer review before empirical conclusions are asserted.
TARGET SCIENTIFIC DELIVERABLE
Georeferenced Chenab Basin hydroelectric cascade & tributary inventory.
EVIDENTIARY & METHODOLOGICAL GUARDRAIL
Proposed Research Target Notice: No original satellite processing, hydrological simulation, or field calibration has yet been completed for this chapter. All research scopes represent structured scientific protocols awaiting execution.