MONOGRAPH 12 · VOLUME XII (TUNNEL EXCAVATION AND GROUNDWATER DISTURBANCE)
Upper Indus, Ladakh & Gilgit-Baltistan Audit — Tunnel Excavation and Groundwater Disturbance
Evaluates high-altitude cold-desert and Karakoram infrastructure (Nimoo Bazgo, Chutak, GB valley stations, Diamer-Basha) under tunnel excavation and groundwater disturbance.
PROPOSED RESEARCH PROTOCOL & EVIDENCE STANDARD
Status: Proposed Monograph Research Chapter Protocol · Preliminary Scoping Established (Project-by-Project Primary Document Authentication Ongoing)
Primary Methods & Sources: UT Ladakh, GB Water & Power Dept., WAPDA/NEPRA records & cryosphere hazard mapping.
STANDARDIZED 13-POINT PROJECT ENERGY-JUSTICE ACCOUNTING
01. Gross generation
Actual metered monthly electricity generated (MWh / GWh)
02. Auxiliary consumption
Electricity consumed internally by powerhouse, gates & camp systems
03. Net generation
Deliverable electricity injected at busbar
04. Host-region entitlement
Contractually allocated free royalty power or right-of-first-refusal quota
05. External allocation
Share contracted via PPAs to utilities outside the generating region
06. Power Purchase Agreements (PPAs)
Tariff formulas, capacity charges, duration & beneficiary states/DISCOMs
07. Royalties & water-usage charges
Statutory water cess/royalty payable and actually transferred to host treasury
08. Local Area Development Funds
Funds disbursed and audited in project-affected panchayats/tehsils
09. Transmission losses
High-voltage evacuation corridor losses prior to local substations
10. Distribution (AT&C) losses
Technical transformer/line losses vs. commercial metering/billing gaps
11. Winter/seasonal power imports
Costly short-term exchange purchases during low-flow winter months
12. Unserved demand / curtailment
MWh of scheduled and unscheduled load shedding borne by host residents
13. End-consumer tariffs
Effective INR/PKR per kWh paid by mountain households, hospitals & enterprises