Skip to main content
Return to Kashmir EcoWatch

EST. 2026  ·  KEW WESTERN HIMALAYAS

HIMALAYANDISPATCH

LANDSCAPE.  PEOPLE.  SCIENCE.  TRUTH.

MONOGRAPH 12 · VOLUME V (REGIONAL OUTAGES, CURTAILMENT AND ENERGY POVERTY)CHAPTER 25 OF 120

Mapping the Outage Atlas: SAIDI, SAIFI and 6–8 Hour Feeder Schedules Beside Powerhouses

Establishes physical equations, definitions, and historical context for regional outages, curtailment and energy poverty across all five Western Himalayan regions.

BY Dr. Fayaz Ahmad Khan & Himalayan Dispatch Hydropower Engineering, Environmental Geology, Geospatial Intelligence and Energy Justice Desk
PROPOSED RESEARCH PROTOCOL & EVIDENCE STANDARD

Status: Proposed Monograph Research Chapter Protocol · Preliminary Scoping Established (Project-by-Project Primary Document Authentication Ongoing)

Primary Methods & Sources: Peer-reviewed engineering/earth-science synthesis & primary archive scoping.

STANDARDIZED 13-POINT PROJECT ENERGY-JUSTICE ACCOUNTING

01. Gross generation
Actual metered monthly electricity generated (MWh / GWh)
02. Auxiliary consumption
Electricity consumed internally by powerhouse, gates & camp systems
03. Net generation
Deliverable electricity injected at busbar
04. Host-region entitlement
Contractually allocated free royalty power or right-of-first-refusal quota
05. External allocation
Share contracted via PPAs to utilities outside the generating region
06. Power Purchase Agreements (PPAs)
Tariff formulas, capacity charges, duration & beneficiary states/DISCOMs
07. Royalties & water-usage charges
Statutory water cess/royalty payable and actually transferred to host treasury
08. Local Area Development Funds
Funds disbursed and audited in project-affected panchayats/tehsils
09. Transmission losses
High-voltage evacuation corridor losses prior to local substations
10. Distribution (AT&C) losses
Technical transformer/line losses vs. commercial metering/billing gaps
11. Winter/seasonal power imports
Costly short-term exchange purchases during low-flow winter months
12. Unserved demand / curtailment
MWh of scheduled and unscheduled load shedding borne by host residents
13. End-consumer tariffs
Effective INR/PKR per kWh paid by mountain households, hospitals & enterprises