MONOGRAPH 12 · VOLUME XIX (ALTERNATIVE ENERGY FUTURES FOR MOUNTAIN COMMUNITIES)CHAPTER 111 OF 120

Chenab & Ravi Cascade Audit — Alternative Energy Futures for Mountain Communities

Investigates Jammu Division projects (Salal, Baglihar, Dulhasti, Sawalkote, Ratle, Pakal Dul, Kiru, Kwar, Kirthai-II) for alternative energy futures for mountain communities.

BY Dr. Fayaz Ahmad Khan & Himalayan Dispatch Hydropower Engineering, Environmental Geology, Geospatial Intelligence and Energy Justice Desk
PROPOSED RESEARCH PROTOCOL & EVIDENCE STANDARD

Status: Proposed Monograph Research Chapter Protocol · Preliminary Scoping Established (Project-by-Project Primary Document Authentication Ongoing)

Primary Methods & Sources: PARIVESH clearances, CEA/JKSPDC/CVPPPL disclosures, CAG/NGT records & DEM analysis.

STANDARDIZED 13-POINT PROJECT ENERGY-JUSTICE ACCOUNTING

01. Gross generation
Actual metered monthly electricity generated (MWh / GWh)
02. Auxiliary consumption
Electricity consumed internally by powerhouse, gates & camp systems
03. Net generation
Deliverable electricity injected at busbar
04. Host-region entitlement
Contractually allocated free royalty power or right-of-first-refusal quota
05. External allocation
Share contracted via PPAs to utilities outside the generating region
06. Power Purchase Agreements (PPAs)
Tariff formulas, capacity charges, duration & beneficiary states/DISCOMs
07. Royalties & water-usage charges
Statutory water cess/royalty payable and actually transferred to host treasury
08. Local Area Development Funds
Funds disbursed and audited in project-affected panchayats/tehsils
09. Transmission losses
High-voltage evacuation corridor losses prior to local substations
10. Distribution (AT&C) losses
Technical transformer/line losses vs. commercial metering/billing gaps
11. Winter/seasonal power imports
Costly short-term exchange purchases during low-flow winter months
12. Unserved demand / curtailment
MWh of scheduled and unscheduled load shedding borne by host residents
13. End-consumer tariffs
Effective INR/PKR per kWh paid by mountain households, hospitals & enterprises