| Jhelum Main Channel (Srinagar Urban) | Pandhrethan to Chattabal Weir | -18.5% active width constriction since 1990 | 142 ha encroached by concrete walls and built structures | Low direct dredging / High illegal shoreline dumping | Severely Constricted | Critical Flood Risk |
| Rambiara River (Shopian / Pulwama) | Heepora to Rohmoo Confluence | +42 m channel widening from heavy excavation collapse | 285 ha gravel floodplain scarred by mechanical extractors | Extreme / Excavation exceeding 4m statutory depth | Decapitated Aquifer Connection | Severe Ecosystem Disturbance |
| Veshaw River (Kulgam) | Aharbal Foothills to Qaimoh | 3.1 m/year lateral bank erosion during flash spates | 168 ha riverbank and willow buffer cleared | High / Boulder extraction weakening riverbed gradient | Moderate / High flash flood velocity | High Vigilance |
| Lidder River (Anantnag) | Pahalgam to Khanabal Confluence | 1.8 m/year lateral migration | 90 ha disturbed by tourism hospitality expansions | Moderate / Seasonal gravel scraping | Fragmented Riparian Buffer | High Vigilance |