Skip to main content
Kashmir EcoWatch
Dr. Kumar's Kashmir EcoWatchGLOBAL INSTITUTE FOR ADVANCED ENVIRONMENTAL STUDIES
Himalayan Dispatch
Remediation Accountability • Satellite Auditing

KEW Western Himalayan
Environmental Restoration Registry

Connecting land transformation detection with remediation accountability. Using spaceborne optical and radar time-series to independently verify re-vegetation and wetland restoration.

EHII-RESTORE Satellite Audit
Remediation Registry
Wular Wetland Eco-Restoration

Wular Wetland Eco-Restoration

Active Dredging
1,420 ha ReclaimedWular Lake Littoral Zone

Mechanical willow de-silting and hydrodynamic channel restoration in northern basin

1,845 ha
Total Verified Remediated
12 Projects
Active Interventions
+34% Biomass
NDVI Green-Up Rate
42 km Line
Riparian Buffer Restored
78.2% Certified
Survival Rate (5-Yr)
Sentinel-2 InSAR
Telemetry Audited
88% Conforming
NGT Compliance Score
38 Gram Panchayats
Community Custodians
Land & Earth SystemsVerified by Telemetry

Wular Wetland Eco-Restoration & Dredging Spoil Containment

Target Objective: Open water surface area restoration and willow removal
Milestone: 1,250 hectares cleared of commercial willow; 4.5M m³ silt removed into geotextile bunds
Agency: Wular Conservation and Management Authority (WUCMA)Target Year: 2026 Target
Energy & InfrastructureUnder Audit

Z-Morh & Zojila Tunnel Spoil Terracing & Bio-Engineering

Target Objective: Muck stabilization on steep gradients using crib-walls and alpine grasses
Milestone: 92% muck volume terraced with zero direct river outfall under independent drone audit
Agency: National Highways & Infrastructure Development Corporation (NHIDCL)Target Year: 2025 Audited
Urban EcologyVerified by Telemetry

Hokersar Wetland Perimeter Buffer & Demarcation Wall

Target Objective: Elimination of construction encroachment and sewage interceptor dyke
Milestone: 11.8 km demarcated; 14 illegal commercial fill attempts intercepted and reversed
Agency: Department of Wildlife Protection (Wetland Division)Target Year: 2026 Active
Mining & Land SystemsProposed

Karewa Geomorphological Heritage Protected Geoparks

Target Objective: Statutory notification of inviolable geomorphological zones prohibiting earth-cutting
Milestone: 2,800 hectares notified under J&K Heritage Act with satellite alert fences active
Agency: Department of Ecology, Environment & Remote Sensing & Revenue DeptTarget Year: 2027 Pipeline