
Executive Synthesis: Kashmir’s Shrinking Seasonal Water Tower
Basin-Wide Western Disturbance Snowfall Variability, Upward Rain-Snow Transition Migration, Snow Water Equivalent Depletion, Advanced Freshet Timing, and Late-Summer Streamflow Deficits Across the Upper Jhelum Watershed
Across the 12,840 km^2 Upper Jhelum Basin, seasonal winter snowpack far outweighs perennial glacier ice in total annual volumetric water delivery—contributing roughly 65–75% of annual river discharge via spring and early-summer snowmelt . By storing December–March Western Disturbance precipitation in solid phase between 1,800 and 4,850 m ASL, the seasonal snow reservoir naturally bridges the four-month gap between winter storms and peak May–August agricultural and municipal water demand.
Integrating 25-year MODIS/VIIRS snow-cover archives , temperature lapse-rate studies , long-term station records , and stable-isotope tracer syntheses , this assessment documents a profound structural shift toward a "warm-snow / early-melt" hydrological regime. Winter warming has pushed the rain-snow transition upward by ~290 m to ~2,140 m ASL, depressing late-March basin Snow-Covered Area to ~51.2%, cutting peak sub-alpine SWE by ~21%, and advancing the spring runoff peak by ~18 days .


