Skip to main content
Kashmir EcoWatch
Dr. Kumar's Kashmir EcoWatchGLOBAL INSTITUTE FOR ADVANCED ENVIRONMENTAL STUDIES
Himalayan Dispatch
Restoration & Mitigation • Compliance Tracking

KEW Western Himalayan
Ecological Restoration & Mitigation Tracker

Independent verification of state and community-led restoration interventions. Auditing target milestones, replantation survival rates, and check dams against telemetry.

EHII-MITIGATE Compliance Registry
Accountability Tracker
Linear Infrastructure Slope Containment

Linear Infrastructure Slope Containment

High Vigilance
18 Active CatchmentsRamban–Banihal Sector

Shotcrete, rock-bolting, and geotextile slope netting along NH-44 four-lane cutting

28 Mandated Sites
Audited Mitigation Sites
46% of Projects
Full Statutory Compliance
62.4% Survival
CAMPA Survival Rate
420,000 m³/yr
Replenishment Deficit
64 km Buffer
Perimeter Monitored
18 Active Chutes
InSAR Slope Stability
NGT O.A. 352/2019
Court Mandated Audits
100% Space Verified
Data Verification
Active Restoration Projects
12 Projects
Across 10 Kashmir districts
Telemetry Verified
68.4%
Confirmed via Sentinel NDVI & InSAR
Under Statutory Audit
31.6%
Awaiting ground inspection verification

State & Community Ecological Interventions

Empirical tracking of progress milestones and remote-sensing verification status.

Land & Earth Systems

Wular Wetland Eco-Restoration & Dredging Spoil Containment

Target: Open water surface area restoration and willow removal

Milestone: 1,250 hectares cleared of commercial willow; 4.5M m³ silt removed into geotextile bunds

Landscape: Wular Lake southern littoral fringe (3,100 ha)Agency: Wular Conservation and Management Authority (WUCMA)
Verified by Telemetry
Target Year: 2026 Target
Energy & Infrastructure

Z-Morh & Zojila Tunnel Spoil Terracing & Bio-Engineering

Target: Muck stabilization on steep gradients using crib-walls and alpine grasses

Milestone: 92% muck volume terraced with zero direct river outfall under independent drone audit

Landscape: Sindh River gorge slopes (Sonamarg-Baltal reach)Agency: National Highways & Infrastructure Development Corporation (NHIDCL)
Under Audit
Target Year: 2025 Audited
Urban Ecology

Hokersar Wetland Perimeter Buffer & Demarcation Wall

Target: Elimination of construction encroachment and sewage interceptor dyke

Milestone: 11.8 km demarcated; 14 illegal commercial fill attempts intercepted and reversed

Landscape: Hokersar Wetland Reserve boundary (14.2 km perimeter)Agency: Department of Wildlife Protection (Wetland Division)
Verified by Telemetry
Target Year: 2026 Active
Mining & Land Systems

Karewa Geomorphological Heritage Protected Geoparks

Target: Statutory notification of inviolable geomorphological zones prohibiting earth-cutting

Milestone: 2,800 hectares notified under J&K Heritage Act with satellite alert fences active

Landscape: Pampore, Chadoora, and Khanmoh Karewa geological cliffsAgency: Department of Ecology, Environment & Remote Sensing & Revenue Dept
Proposed
Target Year: 2027 Pipeline