Skip to main content
Kashmir EcoWatch
Dr. Kumar's Kashmir EcoWatchGLOBAL INSTITUTE FOR ADVANCED ENVIRONMENTAL STUDIES
Himalayan Dispatch
Water Systems

KEW Western HimalayanRestoration & Rejuvenation

Operational ledger of major ecological restoration programs, wetland de-siltation, urban lake rejuvenation, springshed catchment treatments, bio-engineering revetments, and community-led river cleanups across Kashmir and Jammu.

8
Total Projects Tracked
1
Completed Milestones
7
Active / Ongoing
0
DPR Planned
3
Lake Restorations
1
Wetland Habitats
4
Districts Covered
Active
Citizen Monitoring
Institutional Restoration Accountability · CAG Report No. 4 of 2025 & LCMA/WUCMA Records

Distinguishing Capital Expenditure & DPR Approvals from Verified Limnological Recovery

Read Monograph Ch. 18 & Appendices L–M →

Lake restoration tracking across Dal Lake (LCMA: 6 STPs at Habak, Hazratbal, Laam, Brari Nambal, Nallah Amir Khan & Nishat FAB fluidized-bed systems vs untreated catchment sewage deficits, floating gardens & houseboat sanitation), Wular Lake (WUCMA boundary demarcation & willow-removal dredging), Anchar, Khushalsar, Gilsar, and Hokersar strictly separates approved DPRs, financial expenditure, and mechanical de-weeding/dredging from scientifically verified trophic recovery (sustained reductions in total phosphorus, internal sediment P release, and summer Carlson TSI).

Restoration Program Horizons & Guilds

Filter ecological rejuvenation projects by implementation status or ecosystem typology.

Showing 8 of 8 projects

Ecological Restoration & Rejuvenation Spotlight

Curated perspectives on flagship restoration engineering, biological water treatment, community stewardship, and citizen audit protocols.

Lake RestorationONGOING
Dal Lake Restoration Project
Srinagar · Agency: Lakes and Waterways Development Authority

Comprehensive lake restoration including de-weeding, de-silting, sewage interception, and shoreline rehabilitation. Ongoing since 1997.

Target: ActiveView Project
Lake RestorationONGOING
Wular Lake De-siltation
Bandipora · Agency: Wular Conservation and Management Authority

Major de-siltation and catchment treatment project. Aims to restore original water spread area. Critical for flood buffering.

Target: ActiveView Project
Wetland RestorationONGOING
Hokersar Wetland Restoration
Srinagar · Agency: J&K Wildlife Protection Department

Ramsar wetland restoration including hydrological regime restoration, invasive species removal, and habitat enhancement.

Target: ActiveView Project
Spring RejuvenationONGOING
Kokernag Spring Rejuvenation
Anantnag · Agency: JK Rural Development Department

Spring rejuvenation including source protection, recharge area treatment, and tourism infrastructure improvement.

Target: ActiveView Project
River RehabilitationONGOING
Jhelum Riverbank Restoration
Srinagar · Agency: Flood Control Department

Riverbank stabilization and ecological restoration along Jhelum. Includes bioengineering and embankment strengthening.

Target: ActiveView Project
Catchment TreatmentONGOING
Sind River Catchment Treatment
Ganderbal · Agency: Soil Conservation Department

Upper catchment treatment including afforestation, check dams, and erosion control. Reduces sediment load.

Target: ActiveView Project
Spring RejuvenationCOMPLETED
Achabal Spring Conservation
Anantnag · Agency: Tourism Department

Historic spring conservation with Mughal garden restoration. Source protection and water quality maintenance.

Target: ActiveView Project
Lake RestorationONGOING
Manasbal Lake Shoreline Protection
Ganderbal · Agency: LAWDA

Shoreline protection and lotus bed restoration. Bioengineering for erosion control. Tourism infrastructure improvement.

Target: ActiveView Project
Lake RestorationVerified

Dal Lake Restoration Project

Srinagar District·Kashmir Core·Jhelum Basin
18 km²
1580m elev.

Comprehensive lake restoration including de-weeding, de-silting, sewage interception, and shoreline rehabilitation. Ongoing since 1997.

continued-pollutionencroachmentfunding-gaps
ONGOING

Agency: Lakes and Waterways Development Authority

Lake RestorationVerified

Wular Lake De-siltation

Bandipora District·Kashmir Core·Jhelum Basin
189 km²
1580m elev.

Major de-siltation and catchment treatment project. Aims to restore original water spread area. Critical for flood buffering.

continued-siltationinvasive-speciescatchment-degradation
ONGOING

Agency: Wular Conservation and Management Authority

Wetland RestorationVerified

Hokersar Wetland Restoration

Srinagar District·Kashmir Core·Jhelum Basin
13.75 km²
1580m elev.

Ramsar wetland restoration including hydrological regime restoration, invasive species removal, and habitat enhancement.

eutrophicationencroachmentagricultural-runoff
ONGOING

Agency: J&K Wildlife Protection Department

Spring RejuvenationVerified

Kokernag Spring Rejuvenation

Anantnag District·Kashmir Core·Lidder Basin
0.5 km²
1900m elev.

Spring rejuvenation including source protection, recharge area treatment, and tourism infrastructure improvement.

tourism-pressureclimate-changepollution
ONGOING

Agency: JK Rural Development Department

River RehabilitationVerified

Jhelum Riverbank Restoration

Srinagar District·Kashmir Core·Jhelum Basin
1580m elev.

Riverbank stabilization and ecological restoration along Jhelum. Includes bioengineering and embankment strengthening.

continued-encroachmentpollutionfunding-gaps
ONGOING

Agency: Flood Control Department

Catchment TreatmentVerified

Sind River Catchment Treatment

Ganderbal District·Kashmir Core·Sind Basin
150 km²
2500m elev.

Upper catchment treatment including afforestation, check dams, and erosion control. Reduces sediment load.

grazing-pressuredeforestationclimate-change
ONGOING

Agency: Soil Conservation Department

Spring RejuvenationVerified

Achabal Spring Conservation

Anantnag District·Kashmir Core·Jhelum Basin
0.3 km²
1900m elev.

Historic spring conservation with Mughal garden restoration. Source protection and water quality maintenance.

tourism-pressuremaintenance-needs
COMPLETED

Agency: Tourism Department

Lake RestorationVerified

Manasbal Lake Shoreline Protection

Ganderbal District·Kashmir Core·Jhelum Basin
2.8 km²
1580m elev.

Shoreline protection and lotus bed restoration. Bioengineering for erosion control. Tourism infrastructure improvement.

tourism-pressurewave-erosion
ONGOING

Agency: LAWDA