KEW Western HimalayanRainwater Harvesting
Harnessing Kashmir's rainfall (600-1450mm annually) for drinking water augmentation and groundwater recharge. The ESRO EIA Report identifies that rainwater is lost as run off without recharging groundwater.
Harnessing Kashmir's rainfall (600-1450mm annually) for drinking water augmentation and groundwater recharge. The ESRO EIA Report identifies that rainwater is lost as run off without recharging groundwater.
ESRO Finding: Rainwater Loss
The ESRO Environmental Impact Assessment Report documents: "As the major share of precious rainwater is lost as run off without recharging groundwater, the water resources like springs, wells, baulies are drying up." This finding directly supports the need for systematic rainwater harvesting infrastructure across Kashmir.
Six techniques suited for Kashmir's hydrological and topographical conditions
Collection of rainwater from building rooftops through gutters and downpipes, directed to storage tanks or recharge structures.
Excavated pits filled with filter media (boulders, gravel, sand) to facilitate percolation of rainwater into shallow aquifers.
Linear excavated trenches along slopes and contour lines to capture surface runoff and promote groundwater recharge.
Small earthen or masonry dams constructed across streams and nalas to impound rainwater and enhance percolation into underlying aquifers.
Construction of bunds along contour lines on slopes to reduce runoff velocity, increase infiltration, and prevent soil erosion.
Small barriers constructed across seasonal streams to slow water flow, promote sediment deposition, and enhance groundwater recharge.
All districts show High to Very High potential for rainwater harvesting
| District | Annual Rainfall | Potential | Suitable Techniques | Urban Coverage |
|---|---|---|---|---|
| Srinagar | 655mm | Very High | Rooftop RWHRecharge PitsPercolation Tanks | 85% |
| Anantnag | 920mm | Very High | Rooftop RWHCheck DamsRecharge Trenches | 70% |
| Baramulla | 750mm | High | Rooftop RWHContour BundingCheck Dams | 65% |
| Ganderbal | 680mm | High | Recharge TrenchesCheck DamsRooftop RWH | 50% |
| Pulwama | 640mm | High | Contour BundingRooftop RWHPercolation Tanks | 60% |
| Budgam | 620mm | High | Rooftop RWHRecharge PitsContour Bunding | 55% |
| Kupwara | 850mm | Very High | Check DamsRecharge TrenchesContour Bunding | 40% |
| Shopian | 880mm | Very High | Contour BundingCheck DamsRooftop RWH | 45% |